Credits and pricing
How credits are estimated, held, charged and returned, with real examples.
Updated 2026-11-25
How a run is charged
- Before a run you see an estimated range, for example "14 to 69 credits" for a typical plugin (a Skript is usually "10 to 48").
- The top of the range is held (reserved) while the run works; nothing is spent yet.
- When the run ends you are charged for what it actually used. The rest of the hold is released immediately.
- Refusals (a request we will not build) and our own errors cost nothing.
- A run has a credit budget. If it is reached before everything passes, the run stops, keeps its files, and you can continue after adding credits.
Real examples (our own tests, 2026-11-25)
| Request | Result | Credits charged |
|---|---|---|
| "A /heal command with a 30 second cooldown" (plugin) | 11 of 11 test steps passed | 50 |
| Continue and fix a half-finished vote-links plugin | 9 of 9 test steps passed | 34 |
| Essentials-style plugin, planned in 3 milestones | Estimate shown up front | 120 to 584 for all three |
Why the price is what it is
One credit is a fixed price; the number of credits a run costs follows what the run really used (model time, test servers, storage) with a margin on top. Administrators cannot save a price that would leave less than a 50% margin after payment fees. The price of a credit and the rate table are visible to us in the owner panel; the per-run numbers are visible to you in the Costs tab of each project.