Credits and pricing

How credits are estimated, held, charged and returned, with real examples.

Updated 2026-11-25

How a run is charged

  • Before a run you see an estimated range, for example "14 to 69 credits" for a typical plugin (a Skript is usually "10 to 48").
  • The top of the range is held (reserved) while the run works; nothing is spent yet.
  • When the run ends you are charged for what it actually used. The rest of the hold is released immediately.
  • Refusals (a request we will not build) and our own errors cost nothing.
  • A run has a credit budget. If it is reached before everything passes, the run stops, keeps its files, and you can continue after adding credits.

Real examples (our own tests, 2026-11-25)

RequestResultCredits charged
"A /heal command with a 30 second cooldown" (plugin)11 of 11 test steps passed50
Continue and fix a half-finished vote-links plugin9 of 9 test steps passed34
Essentials-style plugin, planned in 3 milestonesEstimate shown up front120 to 584 for all three

Why the price is what it is

One credit is a fixed price; the number of credits a run costs follows what the run really used (model time, test servers, storage) with a margin on top. Administrators cannot save a price that would leave less than a 50% margin after payment fees. The price of a credit and the rate table are visible to us in the owner panel; the per-run numbers are visible to you in the Costs tab of each project.